久久精品国产亚洲av麻豆长发,欧美黄色大片一区二区三区,国产精品久久久久久久久蜜,亚洲香蕉一区二区在线观看,精品国产一区二区三区欧美,国产三级av在线免费观看,www亚洲精品久久久乳网站,日韩欧美亚洲国产中文字幕网

Active vibration isolation table -AVI series vibration isolation solution

2025-08-27 14:44:28 admin

Active vibration isolation table -AVI series vibration isolation solution

Brief description

Unicorn Technology Co., Ltd. has been providing environmental improvement solutions for a wide range of users, offering active vibration isolation performance (starting from 0.5Hz) for electron microscopes and similar large research instruments.
AVI series vibration isolation solution: By eliminating destructive low-frequency vibration noise that interferes with measurement, it helps users obtain more information from the microscope. Among them, the AVI series shock-absorbing platform adopts a thin and modular design, simplifying the installation process. Thus, during installation, there is no need to install dedicated lifting equipment for most instruments (this solution is suitable for the vast majority of EMs).

Unikang Technology Co., Ltd. provides site design solutions
Humanized customized installation
Selection: Provide suitable anti-seismic platform models based on the measurement results of the customer's site
Design: According to the planar dimensions of the electron microscope, design the size of the support plate
Goutong: Customer, electron microscope manufacturer, placement direction of electron microscopes
Drawing: Provide construction drawings for architectural decoration

Unicron Technology Co., Ltd. offers users three modes of active shockproof systems:

  • Passive control mode: It can eliminate ground vibrations after 7Hz

  • Feedback mode: The shock absorption frequency is 0.5Hz, eliminating vibrations from the ground

  • Feedforward control mode: It simultaneously detects the vibrations from the system on the shock absorption platform and from the ground, and then the actuator makes appropriate curve adjustments. The starting frequency of the shock absorption is 0.5Hz


Picture Keywords

Case Sharing: Installation Operation Process of Integrated Installation (TEM)
Step 1: Move the seismic platform to the designated position
Step 2: Position the TEM
Step 3: Debugging of the anti-seismic platform
Step 4: Restore the integral floor
Step 5: The anti-seismic platform is powered on and enters the working state. Installation is complete

Picture Keywords

Integrated laboratory design scheme
There is only the TEM main unit on the ground, which is convenient for maintenance. During maintenance, the ground only needs to be moved away. It is beautiful, elegant, simple and meets the requirements and standards of customers
Work
The active anti-vibration system provides a stable measurement environment for TEM, allowing users to rest assured and worry-free!

Picture Keywords

The above pictures are of TALOS F200i, taken with an ultra-high magnification of 1.6 million times on the active shock absorption system. The sample is Si Nano Wire

Schedule a Free Sample Analysis Today

Contact us to get your customized sample measurement solution.

PRECISION THIN FILM MEASUREMENT EXPERT

HOME 龙门县| 海南省| 灵石县| 磴口县| 泌阳县| 来宾市| 三都| 独山县| 化州市| 尚志市| 错那县| 朝阳市| 仁寿县| 乌什县| 新建县| 横峰县| 泾阳县| 镶黄旗| 沂水县| 永嘉县| 凤台县| 柳林县| 高尔夫| 佛教| 高要市| 息烽县| 承德市| 科技| 五大连池市| 元谋县| 尚志市| 元谋县| 霞浦县| 湖北省| 乐昌市| 崇信县| 金川县| 阳泉市| 鞍山市| 玉树县| 丰原市|